Eden Geothermal is currently setting up to start well testing on Friday 21st January.
Well tests provide Eden Geothermal with essential information about the temperature and permeability of the rock in the target zone, and how water moves through the hot granite deep underground. The results of the tests will enable the company to characterize the geothermal resource and to work out how a two-well geothermal system will perform, and what its heat and power outputs will be/
Testing will last around four weeks and will include both injection and production tests.
For more information:
www.edengeothermal.com
www.edenproject.com